Restaurant design, permits and construction in Oshawa.

Oshawa treats a retail store turned restaurant as a permit even if nothing is built, wants sealed drawings for any commercial job, and Durham Region approves the food premises before it opens.

Book a free consultation

Who signs off on your project here

Two separate approvals, two separate authorities.

A food premises in Ontario needs a municipal building permit and a public health review, and they are not the same submission. In Oshawa they go to these two:

Public health review

Durham Region Health Department

Serves Oshawa, Whitby, Ajax, Pickering, Clarington, Scugog, Uxbridge and Brock.

Their food premises page ↗

Building permit

City of Oshawa Building Permit Services

Issues the permit and carries out the building inspections.

Their permit page ↗

Durham requires a food premises application before you offer food to the public, with a scaled floor plan that lists the finishes for floors, walls, ceilings, counters and shelves. A public health inspector has to carry out a pre-opening inspection and issue an approval before you open, and changes to an existing restaurant need an inspector's written approval.

Grease interceptor rules

Durham Region Sewer Use By-law 55-2013

Every owner or operator of a restaurant or other premises where food is cooked, processed or prepared must install, operate and maintain an oil and grease interceptor to CAN/CSA B481. It is cleaned before solids pass 25 per cent of its volume, a year of clean-out records is kept, and the limit is 150 mg/L.

Verified against each authority's own published material between September and November 2026. Processes and requirements change, and the only answer that counts for your project is the one the authority having jurisdiction gives for your address — check each before you rely on anything here.

On the ground

What is different about building in Oshawa

A change of use is a permit, with or without construction

The City gives converting a retail store to a restaurant as its own example of a change of use, and says a building permit is required even if no construction is proposed. Plan the permit from the start, not only if the kitchen needs walls moved.

Sealed drawings, and site plan first

Oshawa requires drawings for non-residential properties to be signed, sealed and dated by an architect, professional engineer or qualified designer. An application that needs a site plan agreement first is treated as premature and is not processed, so that question gets answered before the drawings are commissioned.

Durham approves before you open

Durham Region's Health Department reviews the floor plan and its listed finishes, then carries out a pre-opening inspection and issues an approval before you open. Revised plans have to be resubmitted, so substituting finishes or moving a sink on site costs a review.

What it costs here

Oshawa buildout ranges, per square foot

These are the same figures our public cost calculator uses, with its market factor for the Greater Toronto Area applied, a second-generation space assumed and all of the kitchen built new. A cold shell runs higher; an operating refresh runs lower; and inheriting a working kitchen — hood, grease interceptor, gas service, most of the equipment — takes it below the bottom of these bars.

Typical range for a second-generation space in Oshawa
  • Restaurant - new build$205/sq ft – $376/sq ft
  • Restaurant - renovation$171/sq ft – $319/sq ft
  • Café or bakery$182/sq ft – $331/sq ft
  • Grocery or specialty food retail$148/sq ft – $257/sq ft
$134/sq ft$390/sq ft
View as table
CategoryLowHigh
Restaurant - new build$205/sq ft$376/sq ft
Restaurant - renovation$171/sq ft$319/sq ft
Café or bakery$182/sq ft$331/sq ft
Grocery or specialty food retail$148/sq ft$257/sq ft
Work out your own number

Projects

Work in and around Oshawa

There is no write-up in Oshawa itself yet. The nearest is this representative profile of a GTA franchise rollout, which includes a location in Pickering, also in Durham Region.

Opening a food business in Oshawa: common questions

Who reviews the plans for a restaurant in Oshawa?

The Durham Region Health Department. A food premises application goes in before you offer food to the public, with a scaled floor plan listing the finishes for floors, walls, ceilings, counters and shelves, and a public health inspector carries out a pre-opening inspection and issues an approval before you open.

Do I need a building permit to turn a store into a restaurant in Oshawa?

Yes, even if nothing is built. The City of Oshawa gives converting a retail store to a restaurant as an example of a change of use and says a permit is required even when no construction is proposed. Non-residential drawings must be signed, sealed and dated by an architect, engineer or qualified designer.

Does a restaurant in Oshawa need a grease interceptor?

Yes. The Ontario Building Code requires one where food is cooked, processed or prepared, and Durham Region Sewer Use By-law 55-2013 requires every restaurant to install, operate and maintain an oil and grease interceptor, clean it before solids pass 25 per cent of its volume and keep a year of clean-out records.

Oshawa projects

Bring us the unit before you sign it.

A site and lease review costs nothing and is the cheapest point at which a project can still change direction. You get a realistic timeline, a preliminary cost breakdown and the risks we can already see in the building.

Mon – Fri, 9:00 a.m. – 5:00 p.m. · No obligation

Call usStart your project