Greater Toronto Area
Mississauga is where most of the region ghost kitchen, commissary and food production space sits, and it is priced as GTA rather than southwestern Ontario.
Book a free consultationWho signs off on your project here
A food premises in Ontario needs a municipal building permit and a public health review, and they are not the same submission. In Mississauga they go to these two:
Public health review
Peel Public Health
Serves Mississauga, Brampton and Caledon.
Their food premises page ↗Building permit
City of Mississauga Building Division
Issues the permit and carries out the building inspections.
Their permit page ↗Peel requires notice at least 14 days before a new food premises opens, and the floor plans have to be approved by Peel Public Health. Renovation involving construction also has to be reported, with notice at least 14 days before construction starts - which is earlier than most operators expect.
Grease interceptor rules
Region of Peel Wastewater By-law 53-2010
Any commercial premises that may discharge fats, oils or grease must install, operate and maintain an interceptor to the Building Code Act. The clause is written for "industrial" premises, but the by-law defines industrial to include commerce, trade and business, so a restaurant is covered. The limit is 150 mg/L.
Verified against each authority's own published material between September and November 2026. Processes and requirements change, and the only answer that counts for your project is the one the authority having jurisdiction gives for your address — check each before you rely on anything here.
On the ground
Fourteen days before opening, and fourteen days before construction starts on a renovation. Those are specific, published requirements, and a schedule that treats public health as an end-of-project step will miss them.
A commissary or a ghost kitchen with several suites needs each one metered, ventilated and drained as its own premises. The shared infrastructure - exhaust, make-up air, gas capacity, the electrical service and the grease interceptor - has to be sized for the whole building at once, and that sizing is the main cost driver on the project.
Our own cost model puts the Greater Toronto Area about 14% above the Kitchener-Waterloo band per square foot, on trades and lead times rather than materials. A budget carried over from a southwestern Ontario project will be short.
What it costs here
These are the same figures our public cost calculator uses, with its market factor for the Greater Toronto Area applied, a second-generation space assumed and all of the kitchen built new. A cold shell runs higher; an operating refresh runs lower; and inheriting a working kitchen — hood, grease interceptor, gas service, most of the equipment — takes it below the bottom of these bars.
Projects
Six-Suite Ghost Kitchen and Shared Commissary
Mississauga, ON · 26 weeks, blueprint to open
Franchise Rollout — Quick-ServiceFour-Location Pizza Franchise Rollout Across the GTA
Toronto, Mississauga, Vaughan and Pickering, ON · 14 months for all four; 19 weeks for the first, 12 for the fourth
Peel Public Health, which serves Mississauga, Brampton and Caledon. Peel requires notice at least 14 days before a new food premises opens, and the floor plans have to be approved by Peel Public Health.
From the City of Mississauga's Building Division. The building permit and Peel Public Health's plan approval are separate approvals, and both have to be in hand before opening.
A renovation involving construction has to be reported at least 14 days before construction starts, as well as 14 days before opening. A schedule that treats public health as an end-of-project step will miss both.
Yes. Region of Peel Wastewater By-law 53-2010 writes its grease interceptor clause for industrial premises, but it defines industrial to include commerce, trade and business. A Mississauga restaurant that may discharge fats, oils or grease has to install, operate and maintain an interceptor, on top of the Building Code requirement for one.
Toronto
Greater Toronto Area
Brampton
Greater Toronto Area
Vaughan
Greater Toronto Area
Markham
Greater Toronto Area
Oakville
Greater Toronto Area
Burlington
Greater Toronto Area
Oshawa
Greater Toronto Area
Hamilton
City of Hamilton
Kitchener
Waterloo Region
Waterloo
Waterloo Region
Cambridge
Waterloo Region
Guelph
Wellington County
London
Southwestern Ontario

Mississauga projects
A site and lease review costs nothing and is the cheapest point at which a project can still change direction. You get a realistic timeline, a preliminary cost breakdown and the risks we can already see in the building.
Mon – Fri, 9:00 a.m. – 5:00 p.m. · No obligation