Skip to content

Start your project

What will your buildout actually cost?

Two questions, and your range appears — before we ask you for anything.

What are you building?

Pick the closest fit. One more question after this, then your range.

Project type

Tell us about the space.

Rough numbers are fine. Size and condition drive most of the budget — your range appears as you answer, and in full on the next screen. We ask for your email after that, not before.

Which market?
What condition is it in?
How much of the kitchen can you keep?

An inherited hood, grease interceptor, gas service and floor drains are six figures of work you are not doing. It is the biggest lever on the number after size.

Your planning range

—

A planning range built from market rates for comparable Ontario projects — not a quote. Your real number depends on the drawings, the equipment package and what the building turns out to be hiding.

Want the line-by-line version?

The range above is yours either way. Leave your details and we will send the breakdown behind it — what sits in each trade, where this type of project usually overruns, and a twenty-minute review of your space with someone who has built these rooms. Within one business day, no obligation, and nothing is shared with anyone.

We record your IP address with your application to block spam. Privacy policy

What moves the number

Four things decide most of your budget.

Understanding these is worth more than any calculator, because they are the levers you can still pull before you sign a lease.

1

The condition of the space

The single biggest lever. A cold shell needs everything — plumbing, ventilation, electrical, fit-out. A second-generation restaurant hands you some of that for free. A retail or office unit is worse than a shell, because change of use pulls occupancy, exiting and barrier-free washrooms into scope.

2

The mechanical load

A Type 1 hood over a cooking line brings exhaust, tempered make-up air, fire suppression and a path to the roof the building has to physically accommodate. A café with a Type 2 hood and no gas is a different budget entirely.

3

The market

Trades and permit fees cost more in the GTA than in Kitchener–Waterloo or London. Same drawings, different number.

4

Size, but not linearly

Fixed costs — the permit set, the mechanical design, the inspections — spread across more floor area. Cost per square foot falls as the space grows, which is why a 9,000 sq ft grocery store can price lower per foot than a 1,200 sq ft café.

Why this is a range and not a price

Anyone who quotes a food buildout to the dollar before seeing drawings is guessing. Until somebody opens a ceiling, nobody knows whether the gas service is sized for your equipment, whether the sanitary stack is where the record drawings say, or whether the roof will carry a new rooftop unit. We have found all three. The range above is what comparable projects cost; the written quote comes after the free consultation, once we have looked properly.

Free Consultation

Get the real number.

Send us the project and we come back within one business day with a timeline, a preliminary cost breakdown and an honest answer if it does not work as scoped.

Mon – Fri, 9:00 a.m. – 5:00 p.m. · No obligation

Call usStart your project