A drawing set does three jobs. It gets you a permit, it tells the trades what to build, and it settles arguments later about what was agreed. A weak set fails at all three.
We produce full architectural, mechanical, plumbing and electrical drawings for restaurants, cafés, bakeries, grocery stores and food production facilities — the complete package a municipality needs for plan review and a contractor needs to price accurately.
Why the mechanical sheet is the one that matters
In a food space, the kitchen exhaust drives more of the budget and more of the review than anything else on the page.
A Type 1 hood over a cooking line requires exhaust, tempered make-up air, fire suppression, and a path to the roof that the building has to physically accommodate. Get the make-up air wrong and the space runs negative — doors pull shut, the dining room is cold in February, and the hood does not capture properly. That is not a snagging item. It is a rebuild.
We size the hood to the equipment line that is actually being ordered, not a generic assumption, which is why we insist on locking the equipment package before the mechanical sheet is finalized.
Drawn once, coordinated across every trade
The failure mode we see most in sets drawn elsewhere is trades that disagree with each other. The plumbing sheet puts a floor drain where the equipment plan puts a leg. The electrical sheet feeds a 208V unit that shipped as 240V. The architectural sheet shows a door swing that blocks the hand sink the health unit requires.
Every one of those gets caught on site, at the worst possible moment, at the highest possible cost. We coordinate the sheets against each other and against the real equipment cut sheets before anything is submitted.
Compliance designed in from the start
Barrier-free washroom clearances, hand sink placement and count, cleanable surfaces, mop sink location, separation of raw and ready-to-eat prep — these are health unit and Building Code requirements that are cheap to design in and expensive to retrofit.
We build them into the first layout rather than reacting to a plan review comment eight weeks later.