Skip to content

Guides

The reference material we wish existed when we started.

Long-form, kept current, and written to be genuinely useful before you ever call us. No email required, nothing gated.

Guides
11
Gated
None
Region
Ontario
Updated
2026
Site Selection12 min read

Before You Sign: Choosing a Space for a Food Business in Ontario

The unit you sign decides most of your budget before a single drawing exists. Here is what to check on site, what to ask the landlord, and the lease clauses that cost operators the most money.

  • The building either has the services a kitchen needs, or you pay to bring them in
  • Confirm zoning and change of use before the offer, not after
  • Unpermitted previous work becomes your obligation the day you take occupancy

Read the guide→

Updated September 2026

Planning14 min read

Opening a Restaurant in Ontario: The Complete Timeline

Every phase of an Ontario restaurant project, what runs in parallel, who is involved, where the money goes out, and the points where schedules realistically slip.

  • Design and approvals take longer than most operators plan for, and cannot be compressed by paying more
  • Long-lead equipment must be ordered before construction is finished, not after
  • Occupancy depends on a chain of final inspections, any one of which can hold the opening

Read the guide→

Updated September 2026

Compliance10 min read

Restaurant Permits in Ontario: Every Approval, in Order

An Ontario restaurant answers to the building department, the public health unit, the fire code, the electrical and gas regimes, the city's licensing office and, if it serves alcohol, the AGCO. Here is each approval, who issues it, and where it falls in the project.

  • The building permit and the public health plan review are separate approvals from separate authorities. Run them at the same time, not one after the other.
  • For a complete application, the Building Code gives the building department 15 days (smaller buildings) or 20 days (larger, Part 3 buildings) to issue or refuse the permit, not counting weekends and holidays.
  • Turning a store into a restaurant can need a permit even with no construction, because a change of use that increases hazard requires one.

Read the guide→

Updated October 2026

Mechanical11 min read

Commercial Kitchen Ventilation, Explained

Hood type, exhaust volume, make-up air, fire suppression and the route to the roof. Why ventilation is usually the largest single mechanical cost in a food buildout, and what decisions move it.

  • Your menu selects your hood type, and the hood type sets the rest of the mechanical scope
  • Exhaust without tempered make-up air does not work, and make-up air is often the bigger cost
  • The building has to physically accommodate the duct route and the rooftop equipment

Read the guide→

Updated September 2026

Grocery12 min read

Opening a Grocery Store in Ontario

Grocery buildouts are a refrigeration and layout problem before they are a construction problem. What drives the budget, what the departments add, and where independent operators most often get caught.

  • Refrigeration is the largest capital item and the largest ongoing operating cost
  • Adding a butcher, bakery or hot table turns a retail fit-out into a food premises project
  • Cost per square foot falls as the store grows, because the fixed costs spread

Read the guide→

Updated September 2026

Café & Bakery11 min read

Opening a Café or Bakery in Ontario

Cafés and bakeries are cheaper to build than restaurants, but only if the menu stays on the right side of one line. Cross it and you inherit a restaurant's mechanical budget without a restaurant's covers.

  • One hot item can move you from a Type 2 hood to a Type 1 and change the whole budget
  • Water, drainage and electrical usually matter more than floor area
  • Bakeries are a production problem — the ovens and the storage decide the layout

Read the guide→

Updated September 2026

Compliance12 min read

What the Health Unit Actually Checks

Public health plan review runs alongside the building permit and asks completely different questions. Here is what a reviewer is looking for, why submissions come back, and what to settle before you draw.

  • Plan review is about food flow, surfaces and sinks — not structure or life safety
  • Sink count and placement is the single most common reason for comments
  • Every surface a reviewer sees must be smooth, non-absorbent and cleanable

Read the guide→

Updated September 2026

Utilities12 min read

Power and Gas: What a Commercial Kitchen Actually Needs

A kitchen is an industrial electrical and gas load inside a retail envelope. What a food business actually draws, how to read a unit's existing service before you sign, and why the utility's schedule is the one part of the project you cannot compress.

  • Most retail units are serviced for a retail tenant, not a kitchen — the shortfall is common, not unusual
  • Three-phase power and gas line capacity are lease-stage questions, not construction-stage questions
  • A high-temperature dish machine's booster heater can draw more than an entire café's cooking line

Read the guide→

Updated September 2026

Refrigeration12 min read

Sizing and Specifying a Walk-In Cooler or Freezer

A walk-in is the one piece of equipment you cannot resize later without rebuilding the room around it. How to size it from deliveries rather than seat counts, why a freezer is a different build from a cooler, and what remote versus self-contained refrigeration actually decides.

  • Size from delivery frequency and case volume, not from a per-seat rule of thumb
  • A freezer needs an insulated floor, which means a ramp or a recessed slab — a design decision with a construction cost
  • Self-contained refrigeration dumps its heat into the room it sits in, which is usually what forces the remote decision

Read the guide→

Updated September 2026

Compliance11 min read

The Dish Area: Warewashing, Sinks and Hot Water

The dish area is the most reliably undersized room in a food buildout and the most common source of plan-review comments. What each fixture is for, high-temperature versus low-temperature machines, and why hot water capacity is the constraint nobody sizes.

  • Four separate fixtures, four separate jobs — and a dish machine does not remove the need for a wash-up sink
  • A high-temperature machine needs a booster heater to reach 82 °C, which is a substantial electrical load
  • Hot water recovery rate matters more than tank size for a dish pit

Read the guide→

Updated September 2026

Design12 min read

Commercial Kitchen Layout: How the Space Decides the Sequence

A layout is the order of operations frozen into a floor plan. The dimensions that decide what fits, the fixed points you inherit from the building, the back-of-house rooms that get forgotten, and how to test a plan before you build it.

  • Food travels one way and soiled returns travel another — every crossing is a collision you pay for every shift
  • Aisle width, equipment depth, hood overhang and clearance to combustibles are why a menu does not fit a unit
  • The appliance line must be final before the hood is fabricated — it is the most consequential freeze point in a build

Read the guide→

Updated September 2026

Free Consultation

Want this applied to your actual space?

Bring the unit, the lease or just the concept. You get a project review, a realistic timeline and a preliminary cost breakdown — at no cost.

Mon – Fri, 9:00 a.m. – 5:00 p.m. · No obligation

Call usStart your project