
Guides
Long-form, kept current, and written to be genuinely useful before you ever call us. No email required, nothing gated.
The unit you sign decides most of your budget before a single drawing exists. Here is what to check on site, what to ask the landlord, and the lease clauses that cost operators the most money.
Read the guide→
Updated November 2026
A buildout quote is not a project budget. This guide starts from the construction and equipment number, adds the seven things that sit on top of it — permits, deposits, smallwares, carry, licences, contingency and working capital — and shows what the all-in total comes to.
Read the guide→
Updated October 2026
Every phase of an Ontario restaurant project, what runs in parallel, who is involved, where the money goes out, and the points where schedules realistically slip.
Read the guide→
Updated November 2026
An Ontario restaurant answers to the building department, the public health unit, the fire code, the electrical and gas regimes, the city's licensing office and, if it serves alcohol, the AGCO. Here is each approval, who issues it, and where it falls in the project.
Read the guide→
Updated November 2026
The licence you need is a Liquor Sales Licence from the AGCO. It costs $1,055 for two years or $1,355 for four, it needs building, fire and public health letters about a finished room, and most new applications are posted publicly before they are decided. Here is what it costs, what it needs, what sets the date, and the six-month rule that skips the slowest step.
Read the guide→
Updated October 2026
Hood type, exhaust volume, make-up air, fire suppression and the route to the roof. Why ventilation is usually the largest single mechanical cost in a food buildout, and what decisions move it.
Read the guide→
Updated November 2026
A Type 1 hood is rarely one line in a budget. It is a hood, welded duct, an exhaust fan, a make-up air unit, a UL 300 suppression system, structural support and a balance report — and on a restaurant fit-out it is usually the largest single mechanical cost. Here is what each part runs, what the two codes require, and why an inherited hood is worth less than it looks.
Read the guide→
Updated November 2026
Grocery buildouts are a refrigeration and layout problem before they are a construction problem. What they cost per square foot, what drives the budget, what the departments add, and where independent operators most often get caught.
Read the guide→
Updated November 2026
Whether a butcher shop answers to the public health unit alone or also needs a provincial meat plant licence depends on what you do to the meat and who you sell it to. Here is where that line falls, what the health unit checks, and what the room has to be built for.
Read the guide→
Updated November 2026
Cafés and bakeries are cheaper to build than restaurants, but only if the menu stays on the right side of one line. Cross it and you inherit a restaurant's mechanical budget without a restaurant's covers.
Read the guide→
Updated November 2026
Public health plan review runs alongside the building permit and asks completely different questions. Here is what a reviewer is looking for, why submissions come back, and what to settle before you draw.
Read the guide→
Updated November 2026
Two sets of rules decide your grease interceptor. The Ontario Building Code says when you need one and how it is sized and installed. Your municipality's sewer-use by-law says how you maintain it, how often, and what records you keep. Here is what each says, for Waterloo Region, Guelph, Toronto, Peel and London.
Read the guide→
Updated November 2026
A kitchen is an industrial electrical and gas load inside a retail envelope. What a food business actually draws, how to read a unit's existing service before you sign, and why the utility's schedule is the one part of the project you cannot compress.
Read the guide→
Updated November 2026
A walk-in is the one piece of equipment you cannot resize later without rebuilding the room around it. How to size it from deliveries rather than seat counts, why a freezer is a different build from a cooler, and what remote versus self-contained refrigeration actually decides.
Read the guide→
Updated November 2026
The dish area is the most reliably undersized room in a food buildout and the most common source of plan-review comments. What each fixture is for, high-temperature versus low-temperature machines, and why hot water capacity is the constraint nobody sizes.
Read the guide→
Updated November 2026
A kitchen design is the order of operations frozen into a floor plan. The dimensions that decide what fits, the fixed points you inherit from the building, the back-of-house rooms that get forgotten, what the design has to settle before the permit, and how to test a plan before you build it.
Read the guide→
Updated November 2026

Free Consultation
Bring the unit, the lease or just the concept. You get a project review, a realistic timeline and a preliminary cost breakdown — at no cost.
Mon – Fri, 9:00 a.m. – 5:00 p.m. · No obligation