Greater Toronto Area
Burlington puts a zoning clearance in front of both the building permit and the business licence, and the licence itself waits on public health, so a Burlington opening date is set by its approvals more than by its construction.
Book a free consultationWho signs off on your project here
A food premises in Ontario needs a municipal building permit and a public health review, and they are not the same submission. In Burlington they go to these two:
Public health review
Halton Region Public Health
Serves Burlington, Oakville, Milton and Halton Hills.
Their food premises page ↗Building permit
City of Burlington Building Department
Issues the permit and carries out the building inspections.
Their permit page ↗Halton recommends notifying Public Health at least 14 days before a new food premises opens, and at least 14 days before submitting the building permit application for a renovation, through its online notification form. It follows up within two business days.
Grease interceptor rules
Halton Region By-laws 184-95 and 2-03
By-law 184-95 requires grease interceptors at food preparation establishments and restaurants, at the owner's or occupant's expense, kept in continuously efficient operation. By-law 2-03 adds 24 months of maintenance records, access for cleaning and inspection, and a limit of 150 mg/L for animal and vegetable fats, oil and grease.
Verified against each authority's own published material between September and November 2026. Processes and requirements change, and the only answer that counts for your project is the one the authority having jurisdiction gives for your address — check each before you rely on anything here.
On the ground
A non-residential zoning clearance certificate has to be approved before Burlington will take a building permit application or a business licence application, and the City says approval can take up to four weeks. That is four weeks to build into the schedule before the permit clock even starts.
Burlington takes building permit applications electronically only, by email. Its interior renovation checklist asks for a letter of use describing the business and its processes, and says commercial cooking needs an exhaust and suppression system designed to NFPA 96.
A Burlington restaurant licence needs an inspection letter from Halton's Medical Officer of Health dated within the last 90 days and a zoning certificate dated within 12 months of the application. The annual fee for restaurants, take-out restaurants and lunch counters is $287.64.
What it costs here
These are the same figures our public cost calculator uses, with its market factor for the Greater Toronto Area applied, a second-generation space assumed and all of the kitchen built new. A cold shell runs higher; an operating refresh runs lower; and inheriting a working kitchen — hood, grease interceptor, gas service, most of the equipment — takes it below the bottom of these bars.
Projects
There is no write-up in Burlington itself yet. The nearest is this representative profile of a commissary in Mississauga.
Halton Region Public Health, which serves Burlington, Oakville, Milton and Halton Hills. Halton recommends notice at least 14 days before opening, and at least 14 days before the building permit application for a renovation, and follows up within two business days.
An approved non-residential zoning clearance certificate, which the City says can take up to four weeks. Applications then go to the Building Department by email only, with a letter of use, and commercial cooking needs an exhaust and suppression system designed to NFPA 96.
An inspection letter from Halton's Medical Officer of Health dated within the last 90 days, confirming the inspections are complete, and a zoning certificate dated within 12 months of the application. The annual fee for restaurants, take-out restaurants and lunch counters is $287.64.
Oshawa
Greater Toronto Area
Hamilton
City of Hamilton
Kitchener
Waterloo Region
Waterloo
Waterloo Region
Cambridge
Waterloo Region
Guelph
Wellington County
London
Southwestern Ontario
Mississauga
Greater Toronto Area
Toronto
Greater Toronto Area
Brampton
Greater Toronto Area
Vaughan
Greater Toronto Area
Markham
Greater Toronto Area
Oakville
Greater Toronto Area

Burlington projects
A site and lease review costs nothing and is the cheapest point at which a project can still change direction. You get a realistic timeline, a preliminary cost breakdown and the risks we can already see in the building.
Mon – Fri, 9:00 a.m. – 5:00 p.m. · No obligation