Greater Toronto Area
Brampton takes every commercial permit application online and wants zoning settled before it accepts one, so most of what decides a Brampton schedule is decided before the drawings are finished.
Book a free consultationWho signs off on your project here
A food premises in Ontario needs a municipal building permit and a public health review, and they are not the same submission. In Brampton they go to these two:
Public health review
Peel Public Health
Serves Brampton, Mississauga and Caledon.
Their food premises page ↗Building permit
City of Brampton Building Division
Issues the permit and carries out the building inspections.
Their permit page ↗Peel requires notice at least 14 days before a new food premises opens, and at least 14 days before construction starts on a renovation, and Peel Public Health has to approve the floor plans. The notification itself has no fee.
Grease interceptor rules
Region of Peel Wastewater By-law 53-2010
Any commercial premises that may discharge fats, oils or grease must install, operate and maintain an interceptor to the Building Code Act. The clause is written for "industrial" premises, but the by-law defines industrial to include commerce, trade and business, so a restaurant is covered. The limit is 150 mg/L.
Verified against each authority's own published material between September and November 2026. Processes and requirements change, and the only answer that counts for your project is the one the authority having jurisdiction gives for your address — check each before you rely on anything here.
On the ground
Brampton's own permit steps start with checking the zoning provisions, to make sure the proposed use is permitted. For a change of use, its checklist asks you to confirm with the Building Division's Zoning Plans Examiner before you apply. A shop or office unit becoming a restaurant is a change of use, even with no construction.
The City's change-of-use checklist says a restaurant needs a climate-controlled garbage room inside the building and a commercial cooking exhaust designed to NFPA 96. The fit-out checklist asks for a letter of use giving the number of employees and the occupant load. Those are drawing-stage decisions, not site decisions.
Peel wants notice 14 days before opening and 14 days before construction starts on a renovation. On the building side, a new building or a new use needs an occupancy permit before anyone occupies the space. A schedule that treats either as an end-of-project formality will slip.
What it costs here
These are the same figures our public cost calculator uses, with its market factor for the Greater Toronto Area applied, a second-generation space assumed and all of the kitchen built new. A cold shell runs higher; an operating refresh runs lower; and inheriting a working kitchen — hood, grease interceptor, gas service, most of the equipment — takes it below the bottom of these bars.
Projects
There is no write-up in Brampton itself yet. These two representative project profiles are the nearest, both in Peel Region.
Six-Suite Ghost Kitchen and Shared Commissary
Mississauga, ON · 26 weeks, blueprint to open
Franchise Rollout — Quick-ServiceFour-Location Pizza Franchise Rollout Across the GTA
Toronto, Mississauga, Vaughan and Pickering, ON · 14 months for all four; 19 weeks for the first, 12 for the fourth
Peel Public Health, which serves Brampton, Mississauga and Caledon. Peel needs notice at least 14 days before a new food premises opens and at least 14 days before construction starts on a renovation, and it has to approve the floor plans. There is no fee for the notification.
From the City of Brampton's Building Division, which takes all industrial, commercial and institutional applications online through the Brampton Building and Business Portal. Check the zoning first: for a change of use, the City asks you to confirm with its Zoning Plans Examiner before applying.
Almost always. The Ontario Building Code requires one wherever a fixture drains fats, oils or grease from an area where food is cooked, processed or prepared, and Region of Peel Wastewater By-law 53-2010 requires a commercial premises that may discharge grease to install, operate and maintain it.
If the building or the use is new, yes. Brampton requires an occupancy permit before a new building or a new use is occupied, and a shop or office unit turned into a restaurant is a new use. It comes after the building inspections, so plan the opening date around it.
Vaughan
Greater Toronto Area
Markham
Greater Toronto Area
Oakville
Greater Toronto Area
Burlington
Greater Toronto Area
Oshawa
Greater Toronto Area
Hamilton
City of Hamilton
Kitchener
Waterloo Region
Waterloo
Waterloo Region
Cambridge
Waterloo Region
Guelph
Wellington County
London
Southwestern Ontario
Mississauga
Greater Toronto Area
Toronto
Greater Toronto Area

Brampton projects
A site and lease review costs nothing and is the cheapest point at which a project can still change direction. You get a realistic timeline, a preliminary cost breakdown and the risks we can already see in the building.
Mon – Fri, 9:00 a.m. – 5:00 p.m. · No obligation