Restaurant design, permits and construction in Markham.

Markham writes its own grease rules on top of York Region's and takes every permit application through one online system, so the drawing set has to be complete before the clock starts.

Book a free consultation

Who signs off on your project here

Two separate approvals, two separate authorities.

A food premises in Ontario needs a municipal building permit and a public health review, and they are not the same submission. In Markham they go to these two:

Public health review

York Region Public Health

Serves Markham, Vaughan, Richmond Hill and the other six municipalities of York Region.

Their food premises page ↗

Building permit

City of Markham Building Standards Department

Issues the permit and carries out the building inspections.

Their permit page ↗

York Region Public Health has to be notified before a new food premises operates, through its New Food Premises Notification Form, with floor plans that show the layout and where the grease traps are. York's guide to opening a food premises asks for 10 business days' notice to book the pre-opening inspection.

Grease interceptor rules

City of Markham Sewer Use By-law 2023-150

Every food sector establishment has to use a grease interceptor. Pot, pan and dish sinks, drains from commercial cooking equipment and hood drains must connect to it; installing or replacing one needs a City building permit; it is inspected and cleaned at least every four weeks; and records stay on site for two years. York Region's by-law applies as well.

Verified against each authority's own published material between September and November 2026. Processes and requirements change, and the only answer that counts for your project is the one the authority having jurisdiction gives for your address — check each before you rely on anything here.

On the ground

What is different about building in Markham

Everything goes through ePLAN

Markham accepts building permit applications only through ePLAN; paper is no longer accepted. A non-refundable $100 pre-application fee is paid before drawings can be uploaded, and the application date is the day the pre-screen is approved. An incomplete set does not start the review clock, it waits in pre-screen.

Retail to restaurant is a change of use

Markham's own permit guide gives changing an existing retail space to a restaurant as its example of a change of use under the Building Code. That pulls washrooms, exiting, occupant load and barrier-free access into scope. The City offers a Zoning Preliminary Review for non-residential projects, to check the zoning before a permit application.

Markham's grease by-law names the fixtures

By-law 2023-150 lists what must drain to the interceptor: pot, pan and dish sinks, drains serving commercial cooking equipment and hood drains, and keeps toilets and fixtures that never handle grease off it. A dish machine needs one of the by-law's set arrangements, such as a pre-rinse sink connected to the interceptor. Plumbing drawn to those rules passes; plumbing drawn to habit gets revised.

What it costs here

Markham buildout ranges, per square foot

These are the same figures our public cost calculator uses, with its market factor for the Greater Toronto Area applied, a second-generation space assumed and all of the kitchen built new. A cold shell runs higher; an operating refresh runs lower; and inheriting a working kitchen — hood, grease interceptor, gas service, most of the equipment — takes it below the bottom of these bars.

Typical range for a second-generation space in Markham
  • Restaurant - new build$205/sq ft – $376/sq ft
  • Restaurant - renovation$171/sq ft – $319/sq ft
  • Café or bakery$182/sq ft – $331/sq ft
  • Grocery or specialty food retail$148/sq ft – $257/sq ft
$134/sq ft$390/sq ft
View as table
CategoryLowHigh
Restaurant - new build$205/sq ft$376/sq ft
Restaurant - renovation$171/sq ft$319/sq ft
Café or bakery$182/sq ft$331/sq ft
Grocery or specialty food retail$148/sq ft$257/sq ft
Work out your own number

Projects

Work in and around Markham

There is no write-up in Markham itself yet. The nearest is this representative profile of a GTA franchise rollout.

Opening a food business in Markham: common questions

Who reviews the plans for a restaurant in Markham?

York Region Public Health. It has to be notified before a new food premises operates, through its New Food Premises Notification Form, with floor plans that show the layout and where the grease traps are. York's opening guide asks for 10 business days' notice to book the pre-opening inspection.

How do I apply for a restaurant building permit in Markham?

Through ePLAN, the City of Markham's online system; paper applications are no longer accepted. A non-refundable $100 pre-application fee is paid before the drawings are uploaded, and the application date is the day the pre-screen is approved. The Building Standards Department reviews it.

What are Markham's grease interceptor rules?

Markham Sewer Use By-law 2023-150 requires every food sector establishment to use a grease interceptor, connects pot, pan and dish sinks, cooking equipment drains and hood drains to it, requires a building permit to install or replace one, and sets inspection and cleaning at least every four weeks with two years of records on site.

Markham projects

Bring us the unit before you sign it.

A site and lease review costs nothing and is the cheapest point at which a project can still change direction. You get a realistic timeline, a preliminary cost breakdown and the risks we can already see in the building.