A food premises in Ontario needs a municipal building permit and a public health review, and they are not the same submission. In London they go to these two:
Public health review
Middlesex-London Health Unit
Serves the City of London and Middlesex County.
Their food premises page ↗Building permit
City of London Building Division
Issues the permit and carries out the building inspections.
Their permit page ↗Anyone operating a food premises in Middlesex-London is required by the Health Protection and Promotion Act to notify the Medical Officer of Health, and floor plans are submitted to the health unit for review.
Verified against each authority's own published material in September 2026. Processes and requirements change, and the only answer that counts for your project is the one the authority having jurisdiction gives for your address — check both before you rely on anything here.
On the ground
A unit inside an enclosed mall has to satisfy the building code and the landlord’s design criteria, and the second is often the tighter of the two. Shopfront treatment, signage, hours of work, delivery routes and the tenant coordinator sign-off all sit on the critical path alongside the permit.
Malls commonly restrict construction to overnight windows, which lengthens a build that would take eight weeks in a stand-alone unit. That belongs in the schedule from the first day, not discovered in week three.
A franchisor drawing set is written for a generic unit. It still has to be reconciled against this building, this health unit and this municipality - and where brand standard and code disagree, code wins and the brand has to approve the deviation.
What it costs here
These are the same figures our public cost calculator uses, with the kitchener–waterloo, guelph, cambridge, london market factor applied and a second-generation space assumed. A cold shell runs higher; an operating refresh runs lower.
Projects

London projects
A site and lease review costs nothing and is the cheapest point at which a project can still change direction. You get a realistic timeline, a preliminary cost breakdown and the risks we can already see in the building.