Skip to content
← All equipment

Commercial Cutlery & Smallwares

The Right Tools, Bulk Sourced At Wholesale.

Smallwares are the hands of your kitchen and the face of your dining room. Sourcing them shouldn't cost a fortune. Whether you need to equip an entire brigade of chefs or restock your front-of-house flatware, we source them at wholesale rather than retail pricing.

Get a quote

We specialize in bulk sourcing to drive down costs. Instead of paying retail prices for every spoon, pan and knife, we leverage our supplier network to get you wholesale pricing on the essential tools your team uses every day.

What we source

  • Commercial Knives & Sharpening Tools
  • Cookware (Pots, Pans, Woks & Baking Sheets)
  • Kitchen Utensils (Tongs, Ladles, Spatulas & Whips)
  • Food Storage (Ingredient Bins, Food Pans & Containers)
  • Tabletop & Dining (Flatware, Chinaware & Glassware)
  • Bar Supplies (Shakers, Pourers & Mats)
  • Sheet Pans, Racks & Trolleys
  • Thermometers & Food Safety Supplies
  • Cleaning, Sanitation & Janitorial

How to specify it

Settle these before you ask anyone for a price. They are what separates a quote you can compare from a number you cannot.

Par levels, not single sets

Smallwares are consumed, broken and walk out of the building. Specify a working par with a replacement allowance rather than exactly one of everything, or you will be reordering in week two.

Match pans to the equipment you bought

Sheet pans, hotel pans and inserts have to fit your ovens, holding cabinets and prep tables. Standard sizes exist for a reason, and buying off-standard is a problem that repeats every service.

Dishwasher compatibility

Anything that cannot go through your dish machine becomes hand-washing labour, every day, forever. Check it before you commit to a pattern of chinaware or glassware.

Replacement availability

Tableware gets broken. Choosing a pattern that will still be stocked in three years is the difference between topping up and re-buying the whole service.

Weight and staff fatigue

Cookware that is beautiful and heavy gets used less and hurts more. The people lifting it eight hours a day should have a say.

Where operators lose money

  • Under-ordering the opening kit

    Smallwares are the category most often left to the last fortnight and most often underbudgeted. It is a substantial line and it lands right when construction costs have finished landing.

  • Buying retail because it is easier

    Retail cookware for a commercial kitchen costs more per unit and lasts a fraction as long under a service duty cycle. The whole point of buying through trade channels is this category.

  • No storage plan

    Pans, containers and dry goods need shelving, and shelving needs floor. Health inspection expects storage off the floor and away from chemicals, and that has to exist in the layout.

  • Ignoring food safety supplies

    Thermometers, sanitiser test strips, date labelling and colour-coded boards are inspection expectations, not nice-to-haves. They are cheap, and their absence is a finding.

Common questions

How much should I budget for smallwares?

It varies with menu and covers, but it is consistently larger than operators expect and it is rarely in the construction budget, because it is not construction. Build it into the opening costs alongside stock and staff, and price the full list at once rather than in dribs.

When should I order?

Later than equipment, but not last. It needs to be on site for staff training and the health inspection, not arriving the week you open. Most of it is stock and moves quickly, so a few weeks out is usually sufficient.

Does any of it matter for inspection?

Yes. Thermometers, sanitiser testing, food storage containers with lids, colour separation between raw and ready-to-eat, and clean storage off the floor are all things an inspector looks for.

Can I mix brands?

For cookware and utensils, freely. For anything modular, pans, inserts and racks, stick to standard sizes so pieces interchange between your equipment.

Free Consultation

Tell us what you want to build.

The first consultation is free. You get a project review, a realistic timeline and a preliminary cost breakdown — including an honest answer if the project does not work as scoped.

Mon – Fri, 9:00 a.m. – 5:00 p.m. · No obligation

Call usStart your project