What the Health Unit Actually Checks

Public health plan review runs alongside the building permit and asks completely different questions. Here is what a reviewer is looking for, why submissions come back, and what to settle before you draw.

The short version

  • Plan review is about food flow, surfaces and sinks — not structure or life safety
  • Sink count and placement is the single most common reason for comments
  • Every surface a reviewer sees must be smooth, non-absorbent and cleanable
  • The inspector at final wants to see what the drawings promised, actually built

Most operators think of “the permit” as one thing. It is at least two, and they are reviewed by different people asking unrelated questions.

The building department cares about structure, occupancy, exiting, fire separation and life safety. The public health unit cares about whether food can be handled safely in the room you have drawn. Same drawing set, two reviews, and they can run at the same time — which they should, because sequencing them costs weeks for no reason.

This is what the health side is looking at.

Sinks — the most common reason for comments

If a submission comes back, sinks are the likeliest cause. They are counted, they are categorised, and each category has to exist independently.

Sink Purpose Why it gets flagged
Handwashing Hands only, nothing else Missing, too far from where food is handled, or blocked by equipment
Warewashing Dishes, pots, utensils Wrong compartment count for the operation
Food preparation Washing produce, thawing Being asked to double as a handwash sink
Mop / service Cleaning water disposal Left out of the drawings entirely

The principle underneath all of it: a sink used for hands cannot be used for anything else, and a reviewer will look at where handwash sinks sit relative to where food is actually handled. A handwash sink in the corner behind a rack is not accessible, however present it is on the plan.

Get the sink schedule right before submission and you remove the most likely comment letter.

Food flow

A reviewer reads the layout as a path: where raw product arrives, where it is stored, where it is prepared, where it is cooked or held, where it is served, and where waste leaves. The question is whether those paths cross in ways that let contamination move from raw to ready-to-eat.

What draws attention:

  • Raw and ready-to-eat prep sharing a surface with no separation in space or sequence
  • Waste leaving through the prep area
  • Deliveries crossing the finished-product zone
  • Storage that puts raw product above ready-to-eat
  • Staff routes that pass through prep to reach the washroom or the back door

None of these are hard to solve on paper. All of them are expensive to solve after the walls are up.

Surfaces and finishes

The standard is roughly: smooth, non-absorbent, cleanable, and durable enough to stay that way. Applied to essentially every surface in the food area.

  • Floors — sealed, coved at the wall junction in wet areas so there is no seam to trap water
  • Walls — washable finish, and specifically so behind sinks, dish areas and cooking lines
  • Ceilings — cleanable, and in prep areas usually smooth rather than open grid
  • Millwork — sealed edges, no raw particleboard, no absorbent surface anywhere food touches
  • Shelving — non-absorbent, off the floor, and set away from walls enough to clean behind

Two things catch people out. Unfinished wood anywhere in a food zone is a reliable comment. And domestic-grade cabinetry — which looks fine and is not built to be washed down repeatedly — often fails on the same grounds.

Equipment certification

Equipment in a commercial food premises is expected to carry recognised certification for commercial use. A reviewer may ask for the certification listing, and an uncertified unit found at final inspection is a genuine problem: the space is otherwise ready, and the fix is to replace the equipment.

This is where “saving” money on an imported or domestic-grade unit becomes the most expensive line in the project. It surfaces at the worst possible moment — when you are days from opening and the only remedy is a new machine with its own lead time.

Include certification documentation in the submission rather than waiting to be asked.

Storage, temperature and water

Cold holding and hot holding need enough capacity for the menu, positioned where the workflow actually needs them, with thermometers. A reviewer will notice if the cold storage looks undersized for the volume the layout implies.

Dry storage needs to be off the floor, away from chemicals, and not doubling as the mop room. Chemical storage separated from food storage is not a subtlety — it is a standard comment.

Hot water has to be sufficient for the fixture count and the dish machine, at the temperature the operation requires. Undersized water heating is a plan-review issue and an operational one.

Change rooms and staff facilities where the staff count warrants, and a place for personal belongings that is not the prep counter.

Washrooms

Fixture counts follow occupant load, which follows seating — so the seating number you choose on the concept sketch quietly sets the plumbing scope. Washrooms need to be accessible without walking through a food preparation area, and barrier-free provisions apply.

If the unit was previously retail or office, this is one of the places a change of use bites hardest.

Why submissions come back

In rough order of frequency:

  1. Sink count or placement — the single biggest one
  2. Missing equipment certification for one or more units
  3. Finish schedule incomplete — the drawings do not say what the surfaces are
  4. Food flow crossings the layout did not resolve
  5. Chemical and dry storage sharing space
  6. No grease interceptor sizing calculation where one is required

Every one of these is avoidable at the drawing stage, and every one costs a full review cycle when it is not. A resubmission is not a quick correction — it goes back into the queue behind everything filed since.

The final inspection

Plan review approves a drawing. The final inspection checks the room.

The inspector is looking for the space to match what was approved: the sinks where they were drawn, the finishes as specified, the equipment as scheduled, hot water at temperature, and everything actually installed rather than on order. Substitutions made during construction — a different unit because the specified one was delayed — are exactly what gets caught here.

If something changed during the build, raise it before the final rather than hoping it passes.

What to settle before drawings start

  • The menu, fixed. It determines equipment, which determines sinks, ventilation and storage.
  • The seating count. It determines washrooms, exiting and occupancy.
  • The equipment schedule, with certification confirmed for every unit.
  • Where waste goes, and how it leaves without crossing prep.
  • Whether the unit has been a food premises before, and if not, what the change of use pulls in.

The honest summary

Plan review is not adversarial and it is not unpredictable. Reviewers are checking a consistent set of things, and a complete, internally consistent submission usually clears without drama.

Projects that struggle almost always did so for one of two reasons: the drawings were incomplete, or the menu was still moving while they were being drawn. Both are decided long before anyone submits anything.

We prepare submissions against the health unit’s requirements before they go in, precisely because a comment letter costs a cycle and a cycle costs weeks of rent on a room you cannot open yet.

Free consultation

Want this applied to your actual space?

Bring the unit, the lease or just the concept. You will get a project review, a realistic timeline and a preliminary cost breakdown — at no cost, and an honest answer if it does not work as scoped.

Start Your Project

Free Consultation

Tell us what you want to build.

The first consultation is free. You get a project review, a realistic timeline and a preliminary cost breakdown — including an honest answer if the project does not work as scoped.

Mon – Fri, 9:00 a.m. – 5:00 p.m. · No obligation

Call usStart your project